Material Handling Equipment · Workstation Cranes

A jib crane is a fixed lifting machine whose boom rotates around a single pivot, serving one circular work area. Standard capacities run from 250 lb to 15,000 lb over spans of 8 to 20 ft. It beats a forklift wherever the same lift repeats in the same place.

The short version

  • 01

    A jib crane earns its keep on repetition, not weight — the metric is lifts per shift in one location, not pounds.

  • 02

    Four numbers size every jib: rated capacity, span, height under boom, and degrees of rotation. Get height under boom wrong and the crane is useless on day one.

  • 03

    Free-standing jibs need an engineered reinforced concrete foundation; that footing routinely costs as much as the crane itself and is the line most budgets forget.

  • 04

    Wall-mounted jibs cost far less and use no floor space, but they cap out near 180 to 200 degrees of rotation and depend entirely on building steel that was designed to take the load.

  • 05

    Jib cranes are not covered by OSHA 1910.179 — the governing consensus standard is ASME B30.11, though 1910.179’s inspection framework is what most facilities actually run.

What a Jib Crane Is — and the One Job It Does Better Than a Forklift

A jib crane is a lifting machine with a horizontal boom that rotates around a fixed vertical pivot. A hoist and trolley ride along that boom, so the load can be raised, carried out or in along the boom’s length, and swung through an arc. The result is a circular work envelope centred on the mast, typically 8 to 20 ft in radius, served by a machine that never moves and never needs an aisle.

That is the whole proposition, and it is narrower than most equipment catalogues admit. A jib crane does not transport. It does not put pallets away. It cannot reach a second workstation forty feet down the line. What it does, better than anything else on a shop floor, is pick a heavy object up off one surface and set it down on another surface within the same circle — over and over, all shift, without an operator certification, without a battery charge, and without a 9,000 lb counterbalanced truck manoeuvring in a space where people are standing.

The comparison that matters is not jib versus forklift in the abstract. It is jib versus the specific forklift trip you are making now. Every time a lift truck is called to a press brake, a paint booth, a machining centre or a loading-dock staging bench to make a single short lift, that trip costs the fleet a cycle it could have spent moving pallets. Tie up a truck for four minutes, thirty times a shift, and you have spent two hours of forklift availability on work the truck was never designed for. Facilities that track this usually find the crane pays back in reclaimed truck hours long before it pays back in labour. Shops sizing a boom for light assembly work frequently find that walkie stackers cover the same pallet weights at a fraction of the installed cost. Under a jib the work still needs presenting at the right height, and lift table capacity and travel decide whether the operator is reaching or lifting all shift.

There is a safety argument underneath the economics. A jib crane keeps a powered industrial truck out of a space where a person has to stand close to the load to guide it. It also removes the temptation to lift something with a forklift that the data plate does not support — a habit that starts the moment an attachment, a long load or an off-centre pick changes the effective forklift rated capacity and nobody recalculates it.

Jib cranes sit alongside, not inside, the truck fleet. If the lift has to travel, you want a truck. If it has to go high in a rack, you want walkie stacker capacities checked against the beam height. If it has to reach overhead structure, that is what scissor lifts and boom lifts are for. If it stays in one circle and repeats, you want a jib.

The Four Types: Free-Standing, Mast, Wall-Mounted and Articulating

The four configurations are not four price points for the same machine. They solve different structural problems, and picking the wrong one is usually a building decision rather than a crane decision. The question that sorts them is simple: what is going to resist the overturning moment when a load hangs at the end of the boom?

A free-standing jib resolves it into the floor, which is why it needs an engineered footing. A mast-type jib carries the vertical load to the floor but transfers the horizontal thrust into overhead building steel, so it needs a roof structure that was designed for it. A wall-mounted jib puts everything into a column or wall bracket. An articulating jib trades reach and capacity for the ability to fold around obstacles that would defeat a straight boom entirely.

Jib crane types at a glance

Total Industries, from published manufacturer capacity ranges

TypeTypical capacityTypical spanRotationFloor spaceWhat it needs
Free-standing (floor-mounted)250 lb – 15,000 lb8 – 20 ft360°Mast footprint plus footingEngineered reinforced concrete foundation
Mast type250 lb – 15,000 lb8 – 20 ft360°Mast footprint onlyOverhead building steel rated for thrust
Wall-mounted / wall bracket250 lb – 5,000 lb8 – 20 ft180° – 200°NoneColumn or wall designed for the reaction loads
Articulating150 lb – 2,000 lb8 – 16 ft combined360° primary, 360° secondaryVaries by mountMount per type; lighter loads only

01 · Free-standing

The default, and the one with a concrete bill

Bolted to its own foundation, independent of the building, 360° rotation, the widest capacity range available. Choose it when the building steel is unknown, unrated, or already spoken for — which in leased space is most of the time. Budget the footing as a separate line item, not a rounding error.

02 · Mast type

Full rotation without the footing

The mast is pinned at floor level and braced to overhead structure. You get 360° and heavy capacity without an engineered foundation, but a structural engineer has to confirm the roof or mezzanine steel can take the horizontal reaction. Common in purpose-built plants, rare in tilt-up leased warehouses.

03 · Wall-mounted

Zero floor space, half the circle

Bracket-mounted to a wall or building column. No floor obstruction at all, which is why it suits packed production lines and dock faces. The trade-off is arc: most units are limited to 180°, some to 200°, and capacity generally stops around 5,000 lb because the reaction loads into the column climb fast.

04 · Articulating

Reaches around things a straight boom cannot

A two-section arm with a second pivot partway out. It will hook into a machine enclosure, through a doorway, or behind a fixture. Capacity is the price — typically 150 lb to 2,000 lb — so it is an assembly, packaging and machine-tending crane, not a steel-handling one.

Sizing One: Capacity, Span, Height Under Boom and Rotation

Manufacturer catalogues are organised by capacity, which encourages buyers to start there and stop there. In practice capacity is the easiest of the four numbers to get right and the least likely to sink the installation. Height under boom sinks installations.

Height under boom — HUB — is the clear vertical distance from the finished floor to the underside of the boom. It is not the height of the mast, and it is not the hook height. Everything that has to pass beneath the boom, and everything the hoist has to lift over, lives inside that dimension: the hoist body, the hook block at full up, the lifting device, the load itself, and the surface the load has to clear. Subtract all of it before you believe a quoted HUB is adequate.

STEP 01Weigh the real load, then add the rigging

Rated capacity must cover the heaviest object plus every piece of below-the-hook equipment: the hook block, slings, spreader bar, vacuum lifter, magnet or C-hook. A 1,800 lb die under a 300 lb lifting beam is a 2,100 lb lift, and the next standard capacity up is 2,500 lb.

Do not size to the average lift. Size to the worst one that will ever happen at that station, then confirm nothing heavier is planned for the line in the next five years.

STEP 02Measure span from the pivot centreline, not the mast face

Span is the horizontal distance from the centre of rotation to the far end of the boom — the maximum working radius. Measure to the furthest point the hook must actually reach, then add the trolley’s end-stop setback, which is typically 6 to 12 in and costs you usable reach at both ends.

Spans over about 20 ft push most buyers toward a bridge crane instead, because boom deflection and foundation size both climb steeply past that point.

STEP 03Build height under boom from the floor upward

Start with the tallest thing that must pass under the boom. Add the height of the load when it is lifted clear, the height of the lifting device, the hook block at its highest position, and the hoist’s own headroom — for a chain hoist and trolley this is commonly 12 to 24 in of lost height.

The result is your minimum HUB. Compare it to the true clear height at the installation point, remembering that sprinkler heads, ductwork, light fixtures, conduit and roof bracing all cut into it.

STEP 04Choose rotation honestly

360° sounds strictly better than 180° and often is not. Ask where the load genuinely comes from and goes to. If the answer is a machine on one side and a pallet on the other, you need perhaps 150° of arc — and a wall-mounted unit will do it for a fraction of a free-standing installation.

Where full rotation is specified, confirm whether it is powered, manual, or fitted with a rotation stop. Stops are frequently required to keep the boom out of a walkway or off a neighbouring machine.

STEP 05Match the duty class to the cycle count

A crane lifting four times a shift and a crane lifting sixty times a shift are not the same machine, even at identical capacity. Hoist duty classification governs motor sizing, brake life and gearbox rating, and under-classing is the most common cause of a workstation crane needing a hoist rebuild inside three years.

Count the actual lifts per hour, the average percentage of rated load, and the running time per lift before the supplier picks a class for you.

Rated capacity
Heaviest load + all below-the-hook rigging, rounded up to the next standard class
Span
Pivot centreline to furthest required hook position, plus 6–12 in trolley setback
Height under boom
Clear floor-to-underside-of-boom; must exceed load + rigging + hook block + hoist headroom
Rotation
360° free-standing and mast; 180°–200° typical wall-mounted
Practical span ceiling
About 20 ft before a bridge crane becomes the cheaper answer
Boom deflection target
Commonly limited to span ÷ 150 to span ÷ 225 at rated load

The expensive mistake

Quoted span is not usable reach

Two suppliers quoting a 16 ft span can deliver 15 ft 6 in and 14 ft 9 in of real hook travel depending on trolley design and end stops. If your furthest pick is at 15 ft, that difference decides whether the crane works. Ask every supplier for maximum hook centreline travel, in writing, before comparing prices.

Foundation and Building Requirements

A free-standing jib crane transfers a large overturning moment into the slab. An existing warehouse floor — typically 5 to 8 in of unreinforced or lightly reinforced concrete over compacted base — cannot take it. The crane needs its own reinforced foundation block, sized by an engineer against the manufacturer’s published reaction loads and the measured soil bearing capacity at that spot. Where a fixed boom cannot reach, a wheeled option often does the job instead, and electric tuggers move rolling loads across a floor without the installed footprint. Where a jib serves a loading dock rather than a single workstation, the real throughput constraint sits upstream with the terminal tractors on the yard that position trailers against the door.

Those reaction loads are specific to capacity, span and mast height, and they are non-negotiable inputs. The engineer also needs the soil’s allowable bearing pressure, which on typical Central Valley and Bay Area industrial sites might be anywhere from 1,500 to 4,000 psf — a range wide enough to double the footing. This is why a foundation quote given before a geotechnical number exists is a guess, and why the first real cost of a jib crane is usually a saw-cut, an excavation and a concrete pour.

The same discipline that governs cantilever racking arm capacities applies here: the structure is only as good as the engineering behind the connection, and a permit authority in California will want to see it. Budget for a licensed engineer’s calculations and stamped drawings, and expect the local building department to require them before anyone pours.

What drives free-standing foundation size

InputWhere it comes fromWhy it matters
Reaction loads (vertical, shear, moment)Crane manufacturer’s published data for that model, capacity and spanThe whole calculation starts here; different manufacturers publish materially different numbers for nominally identical cranes
Allowable soil bearing pressureGeotechnical report or local presumptive valueHalving the bearing value roughly doubles the required footing area
Concrete strength and reinforcementStructural engineer’s design, commonly 3,000–4,000 psiUnder-strength concrete or missing rebar is the failure mode nobody sees until the crane is loaded
Anchor bolt pattern and embedmentManufacturer’s template, set before the pourAnchor bolts are cast in place — a pattern set wrong is a demolition job, not an adjustment
Cure time before loadingConcrete mix design; frequently 7 days to partial and 28 days to full strengthLoading green concrete is the single most common schedule-driven mistake on crane installs

Do not compress this

The crane arrives before the concrete is ready

Delivery lead times and cure times routinely collide. A foundation poured on Friday is not a foundation you can bolt a 5,000 lb crane to on Monday. Confirm the engineer’s required cure duration in writing and schedule the rigging crew around it — not the other way round.

The first real cost of a free-standing jib crane is not the crane. It is a saw cut, an excavation, an engineer’s stamp and a concrete pour that has to be finished weeks before the steel arrives.

Total Industries

Jib Crane vs Forklift vs Overhead Bridge Crane

Three machines overlap in a narrow band, and the decision is almost always settled by two variables: how far the load travels, and how many times a shift it moves. Weight barely enters into it until you are past 10,000 lb.

Under about 20 ft of travel with repetitive cycles in a fixed location, the jib wins. Once the load has to cross a bay, reach multiple stations, or serve a whole production line, a bridge crane’s rectangular coverage beats a jib’s circle decisively, and the cost difference narrows because you are no longer buying four jibs. Where travel is long and irregular — dock to rack, rack to line, line to outbound — nothing displaces the lift truck.

Choosing between the three

Condition at the workstationJib craneForkliftOverhead bridge crane
Repetitive lifts in one fixed locationBest fitWastes truck cyclesOver-specified for one station
Load travels across a bay or between stationsCannot reachWorkableBest fit
Coverage needed over a whole production lineNeeds multiple unitsTies up trucksBest fit
Irregular routes, dock to rack to lineCannot do itBest fitCannot leave the runway
Operator standing close to the loadSafest of the threeHighest riskSafe, higher cost
Building steel unknown or unratedFree-standing worksNo constraintUsually blocked
Capital available is modestLowest of the three installedAlready ownedHighest

4 min

typical forklift round trip to make one short lift at a workstation

Total Industries field observation

30×

lifts per shift at which a dedicated crane usually displaces two hours of truck availability

Total Industries

20 ft

span beyond which a bridge crane generally becomes the cheaper coverage

Total Industries

Inspection and OSHA 1910.179 Duties

This is where most buyers get the compliance picture slightly wrong, and it is worth being precise. OSHA’s overhead and gantry crane standard, 29 CFR 1910.179, applies to overhead and gantry cranes and others sharing the same fundamental characteristics. OSHA has stated in OSHA’s interpretation of ANSI B30.11 that the standard does not apply to underhung cranes, overhead hoists or monorails, which fall instead under that national consensus standard. A typical free-standing or wall-mounted jib crane with an underhung trolley therefore sits under ASME B30.11, not 1910.179 — although 1910.179 does define and cover wall cranes with jibs that run on a wall-mounted runway.

None of that makes a jib crane unregulated. Equipment outside a specific standard still falls under the General Duty Clause, and OSHA routinely references the applicable consensus standard when evaluating whether an employer met it. The practical answer for a facility running mixed lifting equipment is to adopt one inspection regime and apply it to everything, and 1910.179’s structure is the one most maintenance departments already use.

That structure splits inspection into two classes. Frequent inspections run at daily to monthly intervals and cover the things that fail fast: hoist chain or rope wear and twist, hook deformation and cracks, brake function, limit switches and control response. Periodic inspections run at one to twelve month intervals depending on service severity and environment, and add deformed or cracked structural members, loose bolts, worn sheaves and drums, worn pins, bearings, shafts and gears, and brake lining wear. Hook and chain findings require a dated, signed certification record identifying the item inspected. The frequent and periodic crane inspection intervals and the accompanying load-test rule — test loads not exceeding 125 percent of rated load unless the manufacturer directs otherwise — are the benchmarks to write into your own procedure.

Before first use

Initial inspection and load test

New and altered cranes are inspected before being put into service, with the rated load test documented and the certificate retained. This is also when the anchor bolt torque, boom level and rotation stops are verified against the manufacturer’s install sheet.

Every shift

Operator pre-use check

Visual check of hook, chain or rope, hoist brake, pendant or radio control, upper limit switch, and the area under the boom. Anything abnormal takes the crane out of service until a qualified person clears it.

Daily to monthly

Frequent inspection

Hook deformation and cracks, chain wear, twist and stretch, rope condition, brake performance, control function. Hook and chain findings are recorded with date, inspector signature and the item’s serial number or identifier.

1 to 12 months

Periodic inspection

Interval set by activity, severity of service and environment. Adds structural members, fasteners, sheaves, drums, pins, bearings, shafts, gears, rollers, locking and clamping devices, and brake lining wear. Corrosive or high-cycle environments belong at the short end of that range.

Ongoing

Records and training

Keep the dated inspection records, the initial load test certificate and the engineer’s foundation documentation together. Operators need documented training on that specific crane; a forklift certification does not transfer to a hoist.

Non-negotiable

Known constraints

  • hard

    Never exceed the rated capacity on the data plate, including all below-the-hook rigging.

  • hard

    Never lift a load that is not directly under the hook — side-pulling a jib boom loads it in a direction it was not designed for.

  • hard

    Never carry a suspended load over a person, regardless of height or distance.

  • hard

    Take the crane out of service the moment a hook shows deformation or a crack, and tag it.

Frequently Asked Questions

QWhat is a jib crane used for?
It serves a single workstation where the same lift repeats: loading and unloading machine tools, moving dies and fixtures at a press, lifting components onto an assembly bench, transferring drums or castings between a pallet and a work surface, and short picks at a dock or staging area. The defining condition is that the load starts and finishes inside one circle, typically 8 to 20 ft in radius, so nothing has to travel.
QHow much weight can a jib crane lift?
Standard free-standing and mast-type units are commonly offered from 250 lb up to 15,000 lb. Wall-mounted units generally stop around 5,000 lb because the reaction loads into the building column rise sharply with capacity and span. Articulating jibs are lighter still, usually 150 lb to 2,000 lb. Capacity always falls as span increases, so a model rated 5,000 lb at 10 ft may be rated well below that at 16 ft — read the manufacturer’s capacity-versus-span chart rather than the headline number.
QWhat is the difference between a free-standing and a wall-mounted jib crane?
A free-standing jib is bolted to its own engineered concrete foundation and is structurally independent of the building, which buys it full 360 degree rotation and the widest capacity range. A wall-mounted jib brackets onto a wall or building column, uses no floor space at all, and costs substantially less to install because there is no foundation — but rotation is usually limited to 180 or 200 degrees, and the building structure must be verified by an engineer as capable of taking the reaction loads.
QWhat foundation does a free-standing jib crane need?
A reinforced concrete foundation block designed specifically for that crane. The engineer needs the manufacturer’s published reaction loads for the exact capacity, span and mast height, plus the allowable soil bearing pressure at the installation point. An ordinary warehouse slab of 5 to 8 inches is not adequate on its own. Anchor bolts are cast in place from the manufacturer’s template, and the concrete must reach the engineer’s specified strength before the crane is loaded — frequently 7 days to partial strength and 28 days to full.
QJib crane vs forklift — which one for a single workstation?
If the lift repeats in a fixed location and does not need to travel, the jib crane wins on both cost and safety. Every forklift trip to a workstation for one short lift consumes a truck cycle that could have moved pallets, and it puts a powered industrial truck into a space where someone is standing next to the load. If the load has to move between stations, across a bay, or on irregular routes, the forklift is still the right machine and no crane will replace it.
QWhat rotation do jib cranes give you: 180, 200 or 360 degrees?
Free-standing and mast-type jibs give a full 360 degrees. Wall-mounted units are typically limited to 180 degrees, with some designs reaching 200. Articulating jibs offer 360 degrees at the primary pivot plus a further 360 at the second joint, which is what lets them fold around obstructions. Note that full rotation is often deliberately restricted after installation by fitting rotation stops, to keep the boom out of an aisle, a walkway or a neighbouring machine.

Talk to a specialist

Sizing a workstation crane for a specific bay?

Send us the load, the reach and a photo of the space. We will tell you which configuration fits, what the building or foundation has to do, and what the installed number actually looks like — including the concrete.

Last updated